Work has been identified to improve efficiency and resiliency at the Shinnecock Commercial Fishing Dock. Project includes removing and replacing the deteriorated bulkhead; dredge approx. 1,000 CY of material from the docking area; rehabilitate the parking lot and the stormwater retention/infiltration areas; relocate the electrical panel for the Dock Masters House to the location of the building; and upgrade the electrical service to Phase III power supply, water distribution systems, and power pedestal systems.